Install: timing
Timing is how fast the conveyor moves and how early and late each output turns on and off around its station. Step 7 is where a soap arch learns to start two feet before the car arrives.
What people do here
- Type the conveyor speed in feet a minute (20 to 180) and press Save the speed. Measuring it with a cone and a stopwatch comes with a later update; for now, time a cone between two marks a known distance apart and type the result.
- For each output, type how many feet early it turns on and how many feet late it turns off (0 to 20). The seconds that makes at your speed show beside it.
- For each input, type its debounce in milliseconds: how long a switch must hold before it counts. A bouncy loop needs more.
- Press Show the dry run to see each wash package in words on the draft.
Start with the supplier's timing notes. Change one output at a time, and write down why.
Safety
The dry run moves nothing: it is words on the page. Every output still has its hand switch, and when NERV cannot run the tunnel every output goes off within 5 seconds and the crew runs it by hand. No car goes through until the checklist is signed off.
Where the numbers come from
The speed is kept on your wash's tunnel settings at once. The leads, lags and debounces are kept in the draft. The seconds are the feet divided by the speed. The dry run uses the same steps the tunnel uses for a real car; the leads and lags show in it once a later update applies them.