NERVby Three Point Strategy Group
Help · Setup

Install: test, one at a time

Step 5 is where each output is switched on for a moment and each input is checked, one at a time, to prove the wiring matches the list. Test mode comes with a later update. Until it does, the wiring is proved with the commissioning checklist of step 10, with the hand switches.

What people do here

When test mode arrives, a test works like this:

  1. Turn every hand switch to OFF and confirm it on the page.
  2. Put a person at the stop button who can see the whole tunnel.
  3. Tap Test on one output. Its relay clicks and its light shows for at most 2 seconds. Tap Worked or Did not work.
  4. For inputs: walk the loop, block the eye, press the stop button, and watch the input change on the page.

Each result is kept on the row with who did it and when.

Until then, use step 10: with the hand switches, check each output and input the way its checklist item says, and answer Pass, Fail or Not yet with a note.

Safety

A test fires one output, for at most 2 seconds, on a real tap. It is refused while a stop button is pressed, while the tunnel is running, while another test is running, and unless the tablet is at the wash: on the wash's own network, or an owner taps They are here on their own phone. Two people can never test at once. No car goes through until the checklist is signed off.

Where the numbers come from

Each test result will come from the wash computer's own answer, kept on the output or input with who and when, and in Activity.

In NERV, open Help (the question mark at the top of any page, or Help in your menu) and press Email support to write to us.