Install: sign-off and hand-over
Step 11 is the hand-over: the sheets the wash keeps on paper, the sign-off, and the install report, which tells the owners and NERV what was installed and what is still open.
What people do here
- Print the panel sheet: every output and input with its number, name, channel and station, the hand-mode rule, the spare count and the on-call number. Tape it inside the panel door.
- Print the owner's one page: how to run the wash by hand, how to swap the spare computer, and who to call.
- Sign off at the end of the checklist in step 10: the installer and an owner, each with their own sign-in.
- Press Send the report. One email goes to the wash's owners and to NERV: the wash, the version, the modules and the spare, every output and input in use, the paired computers and their version, every checklist item still open with its note, the sign-off or "not signed yet", and what is left.
- Press See the report to read it, Print the report for a paper copy, or Download the list for the outputs and inputs as a spreadsheet.
Send the report before you leave the wash, even when items are open: that is what it is for. The report can be sent again from the Adjust list later.
Safety
Hand mode is the only way the tunnel fails: when NERV cannot run it, every output goes off within 5 seconds and the crew turns the switches to ON or OFF. The tunnel takes no car until the checklist is signed off.
Where the numbers come from
The report is made from your site configuration, the checklist answers and the paired computers at the moment you press the button. It never carries a module's address, a computer's key or anyone's email address. Each report sent is a line in Activity.