NERVby Three Point Strategy Group
Help · Setup

Install: interlocks

An interlock line names outputs that must never be on at the same moment: two pull-back arms on one arch, or two blowers on one supply. NERV will not run a wash that breaks a line. Step 6 is the same list the Tunnel page keeps.

What people do here

  1. Read the list. The stop rule comes first and cannot be taken off: nothing runs while a stop button is pressed.
  2. Look at Suggested from the kinds. NERV suggests a line where two pull-back outputs or two blowers share a station, each with why. Tap Add this line for the ones that are right. Nothing is added without a tap.
  3. Press Add a line for any other pair the supplier names, and say why in a few words.
  4. When the wash truly needs none, press This wash needs none, so the step is answered.

Ask the supplier which outputs share a supply, a motor or an arm. When in doubt, add the line: a line that is not needed costs nothing, and a missing one can break equipment.

Safety

An interlock is a second guard, not the first. The equipment's own wiring and the hand switches still protect it. Each line becomes an item on the checklist in step 10, where it is checked with the hand switches before sign-off.

Where the numbers come from

The lines are kept on your wash's tunnel settings as soon as you add one, and each change is a line in Activity. The suggestions come from the kinds and stations of your outputs. The step is ticked when the list has been answered and every line names outputs that exist.

In NERV, open Help (the question mark at the top of any page, or Help in your menu) and press Email support to write to us.